Brief Description of Works

District Bijnor
Scheme ID 4597326
Scheme Name Kamala GOV QPV Scheme
Village Covered 3
Original Scheme Year 2014
Amount (Lakh) 219.25
Retrofitting Year 0
Amount (Lakh) 0.00
New T/W 0
Rebore T/W 1
New OHT 0
Repair OHT 1
Boundary Wall and Campus Devp. 1
Pump House (New) 0
Pump House (Repair) 1
Pipe Line (New) 1819
Pipe Line (Replacement) 302
FHTC Existing 490
FHTC Repair 140
FHTC New 387
Status
Specific reason for increasing cost 1.5. Since schemes are more then 10 years old and the water level is getting decreased in the tubewells , it has been observed that the condition of the tubewells is deteriorating day by day. Considering this situation, necessasry provisions have been made for the repair of existing tubewells, and in some locations, new tubewells have also been proposed. 2.During the site visit, it was observed that the existing pipeline in the Gram Panchayat has multiple leakages and is severely damaged at several locations due to multiple reasons . As a result, water supply is not reaching some areas. Taking these conditions into account, the new design has been prepared accordingly.