Brief Description of Works
District
Moradabad
Scheme ID
4605021
Scheme Name
Laluwala Mustahkam W/s Scheme (PMJVK)
Village Covered
2
Original Scheme Year
2014
Amount (Lakh)
215.59
Retrofitting Year
0
Amount (Lakh)
0.00
New T/W
0
Rebore T/W
0
New OHT
0
Repair OHT
1
Boundary Wall and Campus Devp.
Repairing Work of boundary Wall, Approach Road, Water Recharge & Campus Development Work
Pump House (New)
0
Pump House (Repair)
1
Pipe Line (New)
4046
Pipe Line (Replacement)
2475
FHTC Existing
972
FHTC Repair
399
FHTC New
309
Status
Partially Functional > 70 lacs
Specific reason for increasing cost
Two villages are included under the scheme. Pipeline has not been laid in one hamlet and as the base year is 2025, the population has increased and with the increase in population, the water demand has increased. Due to increase in water demand, the size of the pipeline has increased, some pipelines and drinking water house connections have been proposed and as the pipelines are damaged at some places, new pipelines and repair works of damaged boundary wall and high water reservoir have been proposed.