Brief Description of Works
District
Budaun
Scheme ID
4753462
Scheme Name
RASOOL PUR KALAN
Village Covered
2
Original Scheme Year
2011
Amount (Lakh)
154.89
Retrofitting Year
2020
Amount (Lakh)
55.91
New T/W
0
Rebore T/W
0
New OHT
0
Repair OHT
1
Boundary Wall and Campus Devp.
Yes
Pump House (New)
0
Pump House (Repair)
1
Pipe Line (New)
1100
Pipe Line (Replacement)
4550
FHTC Existing
1180
FHTC Repair
785
FHTC New
103
Status
Partially Functional > 70 lacs
Specific reason for increasing cost
Scheme covers 2 majras, all of them are scattered in approx 2.5 km radius. In this scheme 15.57 km pipeline was laid previously out of which 4.55 km pipeline is damaged, which needs to be replaced and 1.1 km pipeline extension is required. 103 new FHTCs and 785 FHTCs are proposed for repairing.
