Brief Description of Works
District
Budaun
Scheme ID
4753482
Scheme Name
RIJAULA
Village Covered
1
Original Scheme Year
2013
Amount (Lakh)
514.67
Retrofitting Year
2020
Amount (Lakh)
84.81
New T/W
0
Rebore T/W
1
New OHT
0
Repair OHT
1
Boundary Wall and Campus Devp.
Yes
Pump House (New)
1
Pump House (Repair)
1
Pipe Line (New)
3300
Pipe Line (Replacement)
12000
FHTC Existing
2120
FHTC Repair
798
FHTC New
1936
Status
Partially Functional > 70 lacs
Specific reason for increasing cost
Scheme covers 16 majras, all of them are scattered in approx 18 km radius. It consist 2 nos of T.W out of which one no of tube well is not in functional state and other one needs development. In this scheme 51.50 km pipeline was laid previously out of which 12 km pipeline is damaged, which needs to be replaced and 3.3 km pipeline extension is required. 1569 new FHTCs and 798 FHTCs are proposed for repairing.Scheme covers 16 majras, all of them are scattered in approx 18 km radius. It consist 2 nos of T.W out of which one no of tube well is not in fuctional and other one needs development. In this scheme 51.50 km piepeline was laid previously out of which 12 km pipeline is damaged, which needs to be replaced and 3.3 km pipeline extension is required. 1569 new/replaced pipeline FHTCs and 895