Brief Description of Works
District
Budaun
Scheme ID
4753506
Scheme Name
BASELA
Village Covered
2
Original Scheme Year
2014
Amount (Lakh)
217.21
Retrofitting Year
0
Amount (Lakh)
0.00
New T/W
0
Rebore T/W
0
New OHT
0
Repair OHT
1
Boundary Wall and Campus Devp.
Yes
Pump House (New)
0
Pump House (Repair)
1
Pipe Line (New)
3500
Pipe Line (Replacement)
14000
FHTC Existing
650
FHTC Repair
382
FHTC New
455
Status
Partially Functional > 70 lacs
Specific reason for increasing cost
Scheme covers 5 majras, all of them are scattered in approx 7 km radius. In this scheme 15.83 km piepeline was laid previously out of which 12 km pipeline is damaged, which needs to be replaced and 3.5 km pipeline extension is required. 455 new FHTCs and 382 FHTCs are proposed for repairing.
