Brief Description of Works
District
Unnao
Scheme ID
4827489
Scheme Name
GARHEWA WSS
Village Covered
1
Original Scheme Year
2014
Amount (Lakh)
111.00
Retrofitting Year
2020
Amount (Lakh)
28.00
New T/W
0
Rebore T/W
0
New OHT
0
Repair OHT
1
Boundary Wall and Campus Devp.
Dismantling of existing Plaster & new plaster work, painting, construction of Baundrywall 05 meter
Pump House (New)
0
Pump House (Repair)
1
Pipe Line (New)
2047
Pipe Line (Replacement)
432
FHTC Existing
270
FHTC Repair
123
FHTC New
166
Status
Non-Functional > 100 lacs
Specific reason for increasing cost
1. Total existing pipeline of scheme is 6.02 km with respect to the requirement of 8.07 km as per present survey of OMIL to make the scheme fully functional.
2. Road dismantling & restoration of the 1.28 km required for pipe laying & new HSC.
3. Total existing FHTC found at site 270 with respect to the required 436 Household as per the present OMIL survey out of 270 FHTC, 123 FHTC are damaged condition need to repair. also, no of 166 new HSC is required to the fully functional.