Brief Description of Works

District Unnao
Scheme ID 4827489
Scheme Name GARHEWA WSS
Village Covered 1
Original Scheme Year 2014
Amount (Lakh) 111.00
Retrofitting Year 2020
Amount (Lakh) 28.00
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 1
Boundary Wall and Campus Devp. Dismantling of existing Plaster & new plaster work, painting, construction of Baundrywall 05 meter
Pump House (New) 0
Pump House (Repair) 1
Pipe Line (New) 2047
Pipe Line (Replacement) 432
FHTC Existing 270
FHTC Repair 123
FHTC New 166
Status Non-Functional > 100 lacs
Specific reason for increasing cost 1. Total existing pipeline of scheme is 6.02 km with respect to the requirement of 8.07 km as per present survey of OMIL to make the scheme fully functional. 2. Road dismantling & restoration of the 1.28 km required for pipe laying & new HSC. 3. Total existing FHTC found at site 270 with respect to the required 436 Household as per the present OMIL survey out of 270 FHTC, 123 FHTC are damaged condition need to repair. also, no of 166 new HSC is required to the fully functional.