Brief Description of Works
District
Unnao
Scheme ID
4827500
Scheme Name
Lauwasingan khera WSS
Village Covered
1
Original Scheme Year
2013
Amount (Lakh)
457.45
Retrofitting Year
2020
Amount (Lakh)
257.25
New T/W
0
Rebore T/W
0
New OHT
0
Repair OHT
1
Boundary Wall and Campus Devp.
Dismantling of existing Plaster & new plaster work, painting
Pump House (New)
0
Pump House (Repair)
2
Pipe Line (New)
12911
Pipe Line (Replacement)
5367
FHTC Existing
1277
FHTC Repair
1043
FHTC New
640
Status
Non-Functional > 100 lacs
Specific reason for increasing cost
1. Total existing pipeline of scheme is 41.77 km with respect to the requirement of 12.91 km as per present survey of OMIL to make the scheme fully functional.
2. Road dismantling & restoration of the 5.4 km required for pipe laying & new HSC.
3. Total existing FHTC found at site 1277 with respect to the required 1917 Household as per the present OMIL survey out of 1917 FHTC, 1043 FHTC are damaged condition need to repair. also, no of 640 new HSC is required to the fully functional.
4. one no Railway crossing (cost is 62.91 lac), Add two Habitation newly added