Brief Description of Works

District Unnao
Scheme ID 4827502
Scheme Name Manikapur Water Supply Scheme
Village Covered 2
Original Scheme Year 2008
Amount (Lakh) 119.00
Retrofitting Year 2020
Amount (Lakh) 63.00
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 1
Boundary Wall and Campus Devp. Dismantling of existing Plaster & new plaster work, painting
Pump House (New) 0
Pump House (Repair) 1
Pipe Line (New) 17430
Pipe Line (Replacement) 0
FHTC Existing 412
FHTC Repair 322
FHTC New 219
Status Partially Functional > 70 lacs
Specific reason for increasing cost 1. Total existing pipeline of scheme is 6.09 km with respect to the requirement of 24.33 km as per present survey of OMIL to make the scheme fully functional. 2. Road dismantling & restoration of the 10.04 km required for pipe laying & new HSC. 3. Total existing FHTC found at site 412 with respect to the required Household as per the present OMIL survey out of 631 FHTC, 322 FHTC are damaged condition need to repair. also, no of 219 new HSC is required to the fully functional. 4. Existing pipeline designed for 4kg/cm2, working pressure as per old DPR