Brief Description of Works
District
Unnao
Scheme ID
4827505
Scheme Name
PARA WSS
Village Covered
1
Original Scheme Year
2013
Amount (Lakh)
319.85
Retrofitting Year
2020
Amount (Lakh)
118.62
New T/W
0
Rebore T/W
0
New OHT
0
Repair OHT
1
Boundary Wall and Campus Devp.
Dismantling of existing Plaster & new plaster work, painting
Pump House (New)
0
Pump House (Repair)
1
Pipe Line (New)
14063
Pipe Line (Replacement)
3167
FHTC Existing
405
FHTC Repair
305
FHTC New
623
Status
Non-Functional > 100 lacs
Specific reason for increasing cost
1. Total existing pipeline of scheme is 25.89 km with respect to the requirement of 39.96 km as per present survey of OMIL to make the scheme fully functional.
2. Road dismantling & restoration of the 4.63 km required for pipe laying & new HSC.
3. Total existing FHTC found at site 405 with respect to the required 1008 Household as per the present OMIL survey out of 1008 FHTC, 305 FHTC are damaged condition need to repair. also, no of 623 new HSC is required to the fully functional. And two no Tubewell
4. One OHT Zone and 13 habitations