Brief Description of Works

District Unnao
Scheme ID 4827506
Scheme Name Panai Bujurg WSS
Village Covered 3
Original Scheme Year 2009
Amount (Lakh) 128.00
Retrofitting Year 2020
Amount (Lakh) 90.93
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 1
Boundary Wall and Campus Devp. Dismantling of existing Plaster & new plaster work, painting
Pump House (New) 0
Pump House (Repair) 1
Pipe Line (New) 20545
Pipe Line (Replacement) 0
FHTC Existing 325
FHTC Repair 300
FHTC New 310
Status Partially Functional > 70 lacs
Specific reason for increasing cost 1. Total existing pipeline of scheme is 0 km with respect to the requirement of 20.54 km as per present survey of OMIL to make the scheme fully functional. 2. Road dismantling & restoration of the 11.03 km required for pipe laying & new HSC. 3. Total existing FHTC found at site 325 with respect to the required 592 Household as per the present OMIL survey out of 592 FHTC, 300 FHTC are damaged condition need to repair. also, no of 310 new HSC is required to the fully functional. 4. Existing pipe line designed for 4kg/cm2,working pressure as per old DPR