Brief Description of Works
District
Unnao
Scheme ID
4827508
Scheme Name
PARSANDA WSS
Village Covered
3
Original Scheme Year
2013
Amount (Lakh)
148.26
Retrofitting Year
2020
Amount (Lakh)
54.38
New T/W
0
Rebore T/W
0
New OHT
0
Repair OHT
1
Boundary Wall and Campus Devp.
Dismantling of existing Plaster & new plaster work, painting, Baundrywall repairing
Pump House (New)
0
Pump House (Repair)
1
Pipe Line (New)
5612
Pipe Line (Replacement)
1296
FHTC Existing
382
FHTC Repair
70
FHTC New
331
Status
Partially Functional > 70 lacs
Specific reason for increasing cost
1. Total existing pipeline of scheme is 6.83 km with respect to the requirement of 5.61 km as per present survey of OMIL to make the scheme fully functional.
2. Road dismantling & restoration of the 2.56 km required for pipe laying & new HSC.
3. Total existing FHTC found at site 382 with respect to the required 713 Household as per the present OMIL survey out of 713 FHTC, 70 FHTC are damaged condition need to repair. also, no of 331 new HSC is required to the fully functional.