Brief Description of Works

District Unnao
Scheme ID 4827511
Scheme Name Sheshpur nari Water supply scheme
Village Covered 1
Original Scheme Year 2010
Amount (Lakh) 168.57
Retrofitting Year 2020
Amount (Lakh) 153.86
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 1
Boundary Wall and Campus Devp. Dismantling of existing Plaster & new plaster work, painting
Pump House (New) 0
Pump House (Repair) 1
Pipe Line (New) 19049
Pipe Line (Replacement) 0
FHTC Existing 683
FHTC Repair 294
FHTC New 666
Status Partially Functional > 70 lacs
Specific reason for increasing cost 1. Total existing pipeline of scheme is 7.74 km with respect to the requirement of 26.79 km as per present survey of OMIL to make the scheme fully functional. 2. Road dismantling & restoration of the 12.95 km required for pipe laying & new HSC. 3. Total existing FHTC found at site 683 with respect to the required 1349 Household as per the present OMIL survey out of 1349 FHTC, 294 FHTC are damaged condition need to repair. also, no of 666 new HSC is required to the fully functional. 4. Existing pipeline designed for 4kg/cm2, working pressure as per old DPR