Brief Description of Works
District
Unnao
Scheme ID
4827791
Scheme Name
Kantha Water Supply scheme
Village Covered
1
Original Scheme Year
2013
Amount (Lakh)
436.06
Retrofitting Year
2020
Amount (Lakh)
224.17
New T/W
0
Rebore T/W
0
New OHT
0
Repair OHT
1
Boundary Wall and Campus Devp.
Dismantling of existing Plaster & new plaster work, painting
Pump House (New)
0
Pump House (Repair)
1
Pipe Line (New)
16655
Pipe Line (Replacement)
1786
FHTC Existing
764
FHTC Repair
202
FHTC New
316
Status
Non-Functional > 100 lacs
Specific reason for increasing cost
1. Total existing pipeline of scheme is 40.13 km with respect to the requirement of 56.78 km as per present survey of OMIL to make the scheme fully functional.
2. Road dismantling & restoration of the km required for pipe laying & new HSC.
3. Total existing FHTC found at site 764 with respect to the required 1080 Household as per the present OMIL survey out of 1080 FHTC, 202 FHTC are damaged condition need to repair. also, no of 316 new HSC is required to the fully functional. And two no Tubewell
