Brief Description of Works

District Unnao
Scheme ID 4827792
Scheme Name Padri khurd water supply scheme
Village Covered 1
Original Scheme Year 2013
Amount (Lakh) 180.99
Retrofitting Year 2020
Amount (Lakh) 95.19
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 1
Boundary Wall and Campus Devp. Dismantling of existing Plaster & new plaster work, painting
Pump House (New) 0
Pump House (Repair) 1
Pipe Line (New) 6493
Pipe Line (Replacement) 5625
FHTC Existing 523
FHTC Repair 246
FHTC New 247
Status Non-Functional > 100 lacs
Specific reason for increasing cost 1. Total existing pipeline of scheme is 14.85 km with respect to the requirement of 21.34 km as per present survey of OMIL to make the scheme fully functional. 2. Road dismantling & restoration of the 2.60 km required for pipe laying & new HSC. 3. Total existing FHTC found at site 523 with respect to the required 770 Household as per the present OMIL survey out of 770 FHTC, 246 FHTC are damaged condition need to repair. also, no of 247 new HSC is required to the fully functional. And two no Tubewell 4. FRU required