Brief Description of Works

District Raebareli
Scheme ID 484155
Scheme Name UTTARA GAURI GRAM PANCHAYAT RURAL WATER SUPPLY SCH
Village Covered 1
Original Scheme Year 2009
Amount (Lakh) 124.00
Retrofitting Year 2020
Amount (Lakh) 83.72
New T/W 0
Rebore T/W 1
New OHT 0
Repair OHT 1
Boundary Wall and Campus Devp.
Pump House (New) 0
Pump House (Repair) 1
Pipe Line (New) 2749
Pipe Line (Replacement) 4083
FHTC Existing 513
FHTC Repair 427
FHTC New 357
Status Non-Functional > 100 lacs
Specific reason for increasing cost 1- This is a Non-functional scheme. In this scheme there is 1 revenue village & 6 habitations. 1 existing tubewell (grid based). Existing pipe material in this scheme is PVC. 2- We have proposed 6.832 km distribution pipe line in place of existing pipe line damaged due to construction of drain/nala/road etc. Inside the road due to road widing & change of dia of pipe line in respect of existing pipe line as per current hydraulic design. 3- Provision for construction of 1 new tubewell due to existing defunct tubewell. 4- Provision for construction of 357 new house connection due to increase of population & pending house hold, provision for repairing of 427 existing house connection due to damaged or non-functional. 5- Repairing of boundary wall such as dismantling of damaged plas