Brief Description of Works
District
Raebareli
Scheme ID
484184
Scheme Name
GOJHARI PANCHAYAT RURAL WATER SUPPLY SCHEME
Village Covered
1
Original Scheme Year
2010
Amount (Lakh)
162.11
Retrofitting Year
2020
Amount (Lakh)
117.71
New T/W
0
Rebore T/W
1
New OHT
0
Repair OHT
1
Boundary Wall and Campus Devp.
Pump House (New)
0
Pump House (Repair)
1
Pipe Line (New)
2115
Pipe Line (Replacement)
1179
FHTC Existing
921
FHTC Repair
432
FHTC New
611
Status
Non-Functional > 100 lacs
Specific reason for increasing cost
1- This is a Non-functional scheme. In this scheme there is 1 revenue village & 12 habitations. 1 existing tubewell (grid power). Existing pipe material in this scheme is PVC.
2- We have proposed 7.222 km distribution pipe line in place of existing pipe line damaged due to construction of drain/nala/road etc. Inside the road due to road widing & change of dia of pipe line in respect of existing pipe line as per current hydraulic design.
3- Provision of 25 m National highway crossing.
4- Provision for construction of new tubewell due to existing defunct tubewell.
5- Provision for construction of 611 new house connection due to increase of population & pending house hold, provision for repairing of 432 existing house connection due to damaged or non-functional.
6- Repairing of
