Brief Description of Works

District Raebareli
Scheme ID 484184
Scheme Name GOJHARI PANCHAYAT RURAL WATER SUPPLY SCHEME
Village Covered 1
Original Scheme Year 2010
Amount (Lakh) 162.11
Retrofitting Year 2020
Amount (Lakh) 117.71
New T/W 0
Rebore T/W 1
New OHT 0
Repair OHT 1
Boundary Wall and Campus Devp.
Pump House (New) 0
Pump House (Repair) 1
Pipe Line (New) 2115
Pipe Line (Replacement) 1179
FHTC Existing 921
FHTC Repair 432
FHTC New 611
Status Non-Functional > 100 lacs
Specific reason for increasing cost 1- This is a Non-functional scheme. In this scheme there is 1 revenue village & 12 habitations. 1 existing tubewell (grid power). Existing pipe material in this scheme is PVC. 2- We have proposed 7.222 km distribution pipe line in place of existing pipe line damaged due to construction of drain/nala/road etc. Inside the road due to road widing & change of dia of pipe line in respect of existing pipe line as per current hydraulic design. 3- Provision of 25 m National highway crossing. 4- Provision for construction of new tubewell due to existing defunct tubewell. 5- Provision for construction of 611 new house connection due to increase of population & pending house hold, provision for repairing of 432 existing house connection due to damaged or non-functional. 6- Repairing of