District Raebareli
Scheme ID 484263
Scheme Name SULTANPUR KHERA PANCHAYAT RURAL WATER SUPPLY SCHEM
Village Covered 1
Original Scheme Year 2010
Amount (Lakh) 161.39
Retrofitting Year 2020
Amount (Lakh) 180.46
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 1
Boundary Wall and Campus Devp.
Pump House (New) 0
Pump House (Repair) 1
Pipe Line (New) 77
Pipe Line (Replacement) 7091
FHTC Existing 1253
FHTC Repair 1178
FHTC New 449
Status Partially Functional > 70 lacs
Specific reason for increasing cost 1- This is a Partial-functional scheme. In this scheme there is 1 revenue village & 13 habitations. 1 existing tubewell (grid power). Existing pipe material in this scheme is PVC. 2- We have proposed 7.168 km distribution pipe line in place of existing pipe line damaged due to construction of drain/nala/road etc. Inside the road due to road widing & change of dia of pipe line in respect of existing pipe line as per current hydraulic design. 3- Provision for construction of new 449 house connection due to increase of population & pending house hold, provision for repairing of 1178 existing house connection due to damaged or non-functional. 4- Repairing of boundary wall such as dismantling of damaged plaster/brick work & reconstruction of plaster & brick work. Also painting & colour