Brief Description of Works
District
Raebareli
Scheme ID
484263
Scheme Name
SULTANPUR KHERA PANCHAYAT RURAL WATER SUPPLY SCHEM
Village Covered
1
Original Scheme Year
2010
Amount (Lakh)
161.39
Retrofitting Year
2020
Amount (Lakh)
180.46
New T/W
0
Rebore T/W
0
New OHT
0
Repair OHT
1
Boundary Wall and Campus Devp.
Pump House (New)
0
Pump House (Repair)
1
Pipe Line (New)
77
Pipe Line (Replacement)
7091
FHTC Existing
1253
FHTC Repair
1178
FHTC New
449
Status
Partially Functional > 70 lacs
Specific reason for increasing cost
1- This is a Partial-functional scheme. In this scheme there is 1 revenue village & 13 habitations. 1 existing tubewell (grid power). Existing pipe material in this scheme is PVC.
2- We have proposed 7.168 km distribution pipe line in place of existing pipe line damaged due to construction of drain/nala/road etc. Inside the road due to road widing & change of dia of pipe line in respect of existing pipe line as per current hydraulic design.
3- Provision for construction of new 449 house connection due to increase of population & pending house hold, provision for repairing of 1178 existing house connection due to damaged or non-functional.
4- Repairing of boundary wall such as dismantling of damaged plaster/brick work & reconstruction of plaster & brick work. Also painting & colour
