Brief Description of Works
District
Raebareli
Scheme ID
4843232
Scheme Name
BIJEMAU KHAPURA WATER SUPPLY SCHEME
Village Covered
2
Original Scheme Year
2015
Amount (Lakh)
209.50
Retrofitting Year
2020
Amount (Lakh)
93.35
New T/W
1
Rebore T/W
0
New OHT
0
Repair OHT
1
Boundary Wall and Campus Devp.
Pump House (New)
1
Pump House (Repair)
0
Pipe Line (New)
1147
Pipe Line (Replacement)
2981
FHTC Existing
465
FHTC Repair
425
FHTC New
278
Status
Non-Functional > 100 lacs
Specific reason for increasing cost
1- This is a Non-functional scheme. In this scheme there is 2 revenue village & 6 habitations. 1 existing tubewell (grid based). Existing pipe material in this scheme is HDPE.
2- We have proposed 4.128 km distribution pipe line in place of existing pipe line damaged due to construction of drain/nala/road etc. Inside the road due to road widing & change of dia of pipe line in respect of existing pipe line as per current hydraulic design.
3- Provision for construction of 1 new tubewell due to existing defunct tubewell.
4- Provision for construction of 278 new house connection due to increase of population & pending house hold, provision for repairing of 425 existing house connection due to damaged or non-functional.
5- Provision for construction of new boundary wall & repairing o