Brief Description of Works

District Raebareli
Scheme ID 4843235
Scheme Name GANDHVI WATER SUPPLY SCHEME
Village Covered 13
Original Scheme Year 0
Amount (Lakh) 0.00
Retrofitting Year 0
Amount (Lakh) 0.00
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 3
Boundary Wall and Campus Devp.
Pump House (New) 0
Pump House (Repair) 4
Pipe Line (New) 5999
Pipe Line (Replacement) 6135
FHTC Existing 1761
FHTC Repair 1483
FHTC New 1383
Status Partially Functional > 70 lacs
Specific reason for increasing cost 1- This is a Partial-functional scheme. Already 2 zone existing. In this scheme there is 9 revenue village & 29 habitations. 4 existing tubewell, all are grid based tubewell. 3 existing OHT. Existing pipe material in this scheme is PVC. 2- We have proposed 12.134 km distribution pipe line in place of existing pipe line damaged due to construction of drain/nala/road etc. Inside the road due to road widing & change of dia of pipe line in respect of existing pipe line as per current hydraulic design. 3- Provision for construction of 1383 new house connection due to increase of population & pending house hold, provision for repairing of 1483 existing house connection due to damaged or non-functional. 4- Repairing of 3 existing boundary wall such as dismantling of damaged plaster/bri