Brief Description of Works
District
Raebareli
Scheme ID
4843235
Scheme Name
GANDHVI WATER SUPPLY SCHEME
Village Covered
13
Original Scheme Year
0
Amount (Lakh)
0.00
Retrofitting Year
0
Amount (Lakh)
0.00
New T/W
0
Rebore T/W
0
New OHT
0
Repair OHT
3
Boundary Wall and Campus Devp.
Pump House (New)
0
Pump House (Repair)
4
Pipe Line (New)
5999
Pipe Line (Replacement)
6135
FHTC Existing
1761
FHTC Repair
1483
FHTC New
1383
Status
Partially Functional > 70 lacs
Specific reason for increasing cost
1- This is a Partial-functional scheme. Already 2 zone existing. In this scheme there is 9 revenue village & 29 habitations. 4 existing tubewell, all are grid based tubewell. 3 existing OHT. Existing pipe material in this scheme is PVC.
2- We have proposed 12.134 km distribution pipe line in place of existing pipe line damaged due to construction of drain/nala/road etc. Inside the road due to road widing & change of dia of pipe line in respect of existing pipe line as per current hydraulic design.
3- Provision for construction of 1383 new house connection due to increase of population & pending house hold, provision for repairing of 1483 existing house connection due to damaged or non-functional.
4- Repairing of 3 existing boundary wall such as dismantling of damaged plaster/bri
