Brief Description of Works

District Kannauj
Scheme ID 4861675
Scheme Name Poora Rai Water Supply Scheme
Village Covered 1
Original Scheme Year 0
Amount (Lakh) 518.28
Retrofitting Year 0
Amount (Lakh) 113.82
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 0
Boundary Wall and Campus Devp.
Pump House (New) 0
Pump House (Repair) 0
Pipe Line (New) 0
Pipe Line (Replacement) 0
FHTC Existing 0
FHTC Repair 0
FHTC New 0
Status Non-Functional > 100 lacs
Specific reason for increasing cost THE SCHEME WAS CONSTRUCTED IN 2016 & COVERS 7 HABITATION. HOWEVER AS PER THE NON FUNCTIONAL SCHEME, DURING CONSTRUCTION, A GI & DI PIPE WAS USED, AS PER OUR SURVEY, THE EXISTING NETWORK IS ABOUT 27408 METER, BUT SOME AREAS WERE FOUND MISSING & DAMAGED IN THE EARLIER RECORDS. IN WHICH 3700 METER NEW LINE IS PROPOSED. THEREFORE, WE NEED TO EXTEND THE NETWORK BY ABOUT 370 AND REPAIR APPROX 23708 METERS OF THE DAMAGED NETWORK. HOUSE CONNECTION WITH GI PIPES & TAPS ARE ALMOST MISSING. HENCE, NEW GI PIPES AND TAPS NEED TO BE INSTALLED, ALONG WITH 94 NEW HOUSE CONNECTIONS & 513 REPAIR. TO ENSURE PROPER WATER PRESSURE, SLUICE VALVES & AIR VALVES HAVE BEEN CONSIDERED. IN PUMP HOUSE MINOR REPAIRING CONSIDERED. IN OHT SEEPAGE IN CYLINDRICAL WALL & BOTTOM DOME ARE FOUND SO WATER PROOFING & PAINTING,R