Brief Description of Works
District
Kannauj
Scheme ID
4861681
Scheme Name
Gusaidaspur Water Supply Scheme
Village Covered
1
Original Scheme Year
0
Amount (Lakh)
83.03
Retrofitting Year
0
Amount (Lakh)
25.23
New T/W
0
Rebore T/W
0
New OHT
0
Repair OHT
0
Boundary Wall and Campus Devp.
Pump House (New)
0
Pump House (Repair)
0
Pipe Line (New)
0
Pipe Line (Replacement)
0
FHTC Existing
0
FHTC Repair
0
FHTC New
0
Status
Partially Functional > 70 lacs
Specific reason for increasing cost
THIS SCHEME BASE YEAR IS 2015, COVERING 1 REVENUE VILLAGE & 2 HABITATION. THIS SCHEME IS CONDERED AS PARTIALLY FUNCTIONAL SCHEME. IN THIS SCHEME 6 KG PVC PIPE WAS USED DURING CONSTRUCTION HAVING TOTAL LENGTH 4641 METER,We will only consider the old network 3966 mtr. The other network was damaged during new road and drain (nali) construction. The remaining pipes do not match with the new network . If using the existing network, we will only repair leaks, carry out joint repairs, replace/ extend some pipes, and house connections based on current demand. However, if a new distribution network is designed, it will be planned based on the projected demand for the ultimate year, 2055, starting from the current year. IN WHICH NETWORK IS PROPOSED HAVING LENGTH 1782 METER. OLD FHTCS ARE ALMOST DA