Brief Description of Works
District
Kannauj
Scheme ID
4861685
Scheme Name
Jawamardpur Water Supply Scheme
Village Covered
1
Original Scheme Year
0
Amount (Lakh)
117.26
Retrofitting Year
0
Amount (Lakh)
46.75
New T/W
0
Rebore T/W
0
New OHT
0
Repair OHT
0
Boundary Wall and Campus Devp.
Pump House (New)
0
Pump House (Repair)
0
Pipe Line (New)
0
Pipe Line (Replacement)
0
FHTC Existing
0
FHTC Repair
0
FHTC New
0
Status
Partially Functional > 70 lacs
Specific reason for increasing cost
THE SCHEME WAS CONSTRUCTED IN 2016 & COVERS 3 HABITATION. HOWEVER AS PER THE PARTIALLY FUNCTIONAL SCHEME, DURING CONSTRUCTION, A 6 KG PVC PIPE WAS USED, WHICH IS NOW 40% TO 50% DAMAGED & NON FUNCTIONAL. AS PER OUR SURVEY, THE EXISTING NETWORK IS ABOUT 5968 METER, BUT SOME AREAS WERE FOUND MISSING IN THE EARLIER RECORDS. IN WHICH 1874 METER NEW LINE IS PROPOSED. THEREFORE, WE NEED TO EXTEND THE NETWORK BY ABOUT 1874 AND REPAIR APPROX 4133 METERS OF THE DAMAGED NETWORK. HOUSE CONNECTION WITH GI PIPES & TAPS ARE ALMOST MISSING. HENCE, NEW GI PIPES AND TAPS NEED TO BE INSTALLED, ALONG WITH 71 NEW HOUSE CONNECTIONS & 73 REPAIR. TO ENSURE PROPER WATER PRESSURE, SLUICE VALVES & AIR VALVES HAVE BEEN CONSIDERED. SOME REPAIR WORK IS ALSO REQUIRED FOR THE PUMP & IN OHT SEEPAGE IN CYLINDRICAL WALL &