Brief Description of Works
District
Kannauj
Scheme ID
4861686
Scheme Name
Asauliya Water Supply Scheme
Village Covered
1
Original Scheme Year
0
Amount (Lakh)
168.80
Retrofitting Year
0
Amount (Lakh)
27.85
New T/W
0
Rebore T/W
0
New OHT
0
Repair OHT
0
Boundary Wall and Campus Devp.
Pump House (New)
0
Pump House (Repair)
0
Pipe Line (New)
0
Pipe Line (Replacement)
0
FHTC Existing
0
FHTC Repair
0
FHTC New
0
Status
Non-Functional > 100 lacs
Specific reason for increasing cost
THE SCHEME WAS CONSTRUCTED IN 2014-2015 & COVERS 3 HABITATIONS.HOWEVER, AS PER THE NON FUNCTIONAL SCHEME,DURING CONSTRUCTION 6 KG PVC PIPES WAS USED,WHICH IS NOW ALMOST DAMAGED & NON FUNCTIONAL. AS PER OUR SURVEY, THE EXISTING NETWORK IS ABOUT 9816 METERS, WE NEED TO REPALCE APPROX. 4473 METER NETWORK FOR START REGULAR WATER SUPPLY INTHE SCHEME. HOUSE CONNECTIONS WITH GI PIPES AND TAPS ARE ALMOST DAMAGED IN THE SCHEME. HENCE NEW GI PIPES AND TAPS NEED TO BE INSTALLED ALONG WITH 49 NEW HOUSEHOLD CONNECTION. TO ENSURE PROPER WATER PRESSURE, SLUICE VALVES AND AIR VALVES HAVE BEEN CONSIDERED. SINCE THE SCHEME IS OLD & NON FUNCTIONAL. SOME REPAIR WORK IS ALSO REQUIRED FOR THE BOUNDARY WALL,PUMP HOUSE & OHT. IN OHT SEEPAGE IN BOTTOM DOME ARE FOUND SO WATER PROOFING & PAINTING IS CONSIDERED. THE