Brief Description of Works
District
Kannauj
Scheme ID
4866484
Scheme Name
NIGOH KHAS WATER SUPPLY SCHEME
Village Covered
1
Original Scheme Year
0
Amount (Lakh)
160.73
Retrofitting Year
0
Amount (Lakh)
26.61
New T/W
0
Rebore T/W
0
New OHT
0
Repair OHT
0
Boundary Wall and Campus Devp.
Pump House (New)
0
Pump House (Repair)
0
Pipe Line (New)
0
Pipe Line (Replacement)
0
FHTC Existing
0
FHTC Repair
0
FHTC New
0
Status
Partially Functional > 70 lacs
Specific reason for increasing cost
THE SCHEME WAS CONSTRUCTED IN 2014 & COVERS TWO HABITATION. HOWEVER AS PER THE PARTIAL SCHEME, REGULAR WATER SUPPLY IS RUNNING ONLY IN HALF VILLAGE IN WHICH ONE VILLAGE IS FULLY DEAD. DURING CONSTRUCTION, A 6 KG PVC PIPE WAS USED, WHICH IS NOW 50% TO 60% DAMAGED & NON FUNCTIONAL. AS PER OUR SURVEY, THE EXISTING NETWORK IS ABOUT 6648 METER, BUT SOME AREAS WERE FOUND MISSING IN THE EARLIER RECORDS. IN WHICH 2992 METER NEW LINE IS PROPOSED. THEREFORE, WE NEED TO EXTEND THE NETWORK BY ABOUT 2992 AND REPAIR APPROX 800 METERS OF THE DAMAGED NETWORK. HOUSE CONNECTION WITH GI PIPES & TAPS ARE ALMOST MISSING. HENCE, NEW GI PIPES AND TAPS NEED TO BE INSTALLED, ALONG WITH 76 NEW HOUSE CONNECTIONS. TO ENSURE PROPER WATER PRESSURE, SLUICE VALVES & AIR VALVES HAVE BEEN CONSIDERED. SINCE, THE SCHEME IS O