Brief Description of Works
District
Kannauj
Scheme ID
4866523
Scheme Name
UMAR PUR WATER SUPPLY SCHEME
Village Covered
2
Original Scheme Year
0
Amount (Lakh)
157.07
Retrofitting Year
0
Amount (Lakh)
34.45
New T/W
0
Rebore T/W
0
New OHT
0
Repair OHT
0
Boundary Wall and Campus Devp.
Pump House (New)
0
Pump House (Repair)
0
Pipe Line (New)
0
Pipe Line (Replacement)
0
FHTC Existing
0
FHTC Repair
0
FHTC New
0
Status
Non-Functional > 100 lacs
Specific reason for increasing cost
THE SCHEME WAS CONSTRUCTED IN 2016 & COVERS THREE HABITATION. HOWEVER AS PER THE NON FUNCTIONAL SCHEME, REGULAR WATER SUPPLY IS NOT RUNNING IN VILLAGE. DURING CONSTRUCTION, AS PER OUR SURVEY, THE EXISTING NETWORK IS ABOUT 9392 MTR(6 KG PVC PIPE) BUT SOME AREAS WERE FOUND MISSING IN THE EARLIER RECORDS. IN WHICH 4076 METER NEW LINE IS PROPOSED. THEREFORE, WE NEED TO EXTEND THE NETWORK BY ABOUT 4076 AND REPAIR APPROX 1390 METERS OF THE DAMAGED NETWORK. HOUSE CONNECTION WITH GI PIPES & TAPS ARE ALMOST MISSING. HENCE, NEW GI PIPES AND TAPS NEED TO BE INSTALLED, ALONG WITH 63 NEW HOUSE CONNECTIONS. TO ENSURE PROPER WATER PRESSURE, SLUICE VALVES & AIR VALVES HAVE BEEN CONSIDERED. SINCE, THE SCHEME IS OLD, SOME REPAIR WORK IS ALSO REQUIRED FOR THE PUMP & IN OHT SEEPAGE IN CYLINDRICAL WALL & BOTTO