Brief Description of Works

District Kannauj
Scheme ID 4866577
Scheme Name MATOULI WATER SUPPLY SCHEME
Village Covered 1
Original Scheme Year 0
Amount (Lakh) 127.56
Retrofitting Year 0
Amount (Lakh) 60.31
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 0
Boundary Wall and Campus Devp.
Pump House (New) 0
Pump House (Repair) 0
Pipe Line (New) 0
Pipe Line (Replacement) 0
FHTC Existing 0
FHTC Repair 0
FHTC New 0
Status Partially Functional > 70 lacs
Specific reason for increasing cost THE SCHEME WAS CONSTRUCTED IN 2011 & COVERS 5 HABITATION. HOWEVER AS PER THE PARTIAL SCHEME, DURING CONSTRUCTION, A 4 KG PVC PIPE WAS USED, WHICH IS NOW 70% TO 80% DAMAGED & NON FUNCTIONAL. AS PER OUR SURVEY, THE EXISTING NETWORK IS ABOUT 12459 METER, BUT SOME AREAS WERE FOUND MISSING & DAMAGED IN THE EARLIER RECORDS. IN WHICH 902 METER NEW LINE IS PROPOSED. THEREFORE, WE NEED TO EXTEND THE NETWORK BY ABOUT 902 AND REPAIR APPROX 10199 METERS OF THE DAMAGED NETWORK. HOUSE CONNECTION WITH GI PIPES & TAPS ARE ALMOST MISSING. HENCE, NEW GI PIPES AND TAPS NEED TO BE INSTALLED, ALONG WITH 35 NEW HOUSE CONNECTIONS & 272 REPAIR. TO ENSURE PROPER WATER PRESSURE, SLUICE VALVES & AIR VALVES HAVE BEEN CONSIDERED. TUBE WELL & PUMP HOUSE ARE OK & IN OHT SEEPAGE IN CYLINDRICAL WALL & BOTTOM DOME ARE FOU