Brief Description of Works

District Kannauj
Scheme ID 4866590
Scheme Name ANTI
Village Covered 2
Original Scheme Year 0
Amount (Lakh) 122.24
Retrofitting Year 0
Amount (Lakh) 33.08
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 0
Boundary Wall and Campus Devp.
Pump House (New) 0
Pump House (Repair) 0
Pipe Line (New) 0
Pipe Line (Replacement) 0
FHTC Existing 0
FHTC Repair 0
FHTC New 0
Status Partially Functional > 70 lacs
Specific reason for increasing cost THE SCHEME WAS CONSTRUCTED IN 2013-14 AND COVERS 4 HABITATIONS. HOWEVER, AS PER THE PARTIAL SCHEME, REGULAR WATER SUPPLY IS RUNNING IN ONLY 3 HABIRATIONS. DURING CONSTRUCITON, 6 KG PVC PIPE WAS USED, WHICH IS NOW ALMOST DAMAGED AND NON FUNCTIONAL IN MANY PLACES. AS PER OUR SURVEY THE EXISTING NETOWORK IS ABOOUT 8198 METERS, BUT SOME AREA WERE FOUND MISSING IN THE EARLIER RECORDS. WE NEED TO REPLACE 2620 METERS OF THE DAMAGED NETWORK. HOUSE CONNECTION WITH GI PIPES AND TAPS ARE ALMOST MISSING IN THE SCHEME,HENCE, NEW GI PIPES AND TAPS NEED TO BE INSTALLED ALONG WITH 55 NEW CONNECTION. TO ENSURE PROPER WATER PRESURE,SLUICE VALVES AND AIR VALVES HAS BEEN CONSIDERED. SINCE THE SCHEME IS OLD, SOME REPAIR WORK IS ALOS REQUIRED FOR THE BOUNDARY WALL,PUMP HOUSE AND OHT.THE BOREWELL PUMP IS CURREN