Brief Description of Works

District Kannauj
Scheme ID 4866622
Scheme Name Jasauli Water Supply Scheme
Village Covered 1
Original Scheme Year 0
Amount (Lakh) 137.77
Retrofitting Year 0
Amount (Lakh) 66.40
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 0
Boundary Wall and Campus Devp.
Pump House (New) 0
Pump House (Repair) 0
Pipe Line (New) 0
Pipe Line (Replacement) 0
FHTC Existing 0
FHTC Repair 0
FHTC New 0
Status Non-Functional > 100 lacs
Specific reason for increasing cost THE SCHEME WAS CONSTRUCTED IN 2013-14 & COVERS 1 REVENUE VILLAGE & 3 HABITATIONS.HOWEVER, AS PER THE NON FUNCTIONAL SCHEME,DURING CONSTRUCTION 6 KG PVC PIPES WAS USED,WHICH IS NOW ALMOST DAMAGED & NON FUNCTIONAL. AS PER OUR SURVEY, THE EXISTING NETWORK IS ABOUT 13317 METERS, WE NEED TO REPALCE APPROX. 3364 METER NETWORK FOR START REGULAR WATER SUPPLY INTHE SCHEME. HOUSE CONNECTIONS WITH GI PIPES AND TAPS ARE ALMOST DAMAGED IN THE SCHEME. HENCE NEW GI PIPES AND TAPS NEED TO BE INSTALLED ALONG WITH 89 NEW HOUSEHOLD CONNECTION AND 186 CONNECTION REPAIRED OUT OF 268 CONNECTIOM. TO ENSURE PROPER WATER PRESSURE, SLUICE VALVES AND AIR VALVES HAVE BEEN CONSIDERED. SINCE THE SCHEME IS OLD & NON FUNCTIONAL. SOME REPAIR WORK IS ALSO REQUIRED FOR THE BOUNDARY WALL.IN OHT SEEPAGE IN CYLINDIRCAL WALL AR