Brief Description of Works

District Kannauj
Scheme ID 4866627
Scheme Name Faguha Water Supply Scheme
Village Covered 1
Original Scheme Year 0
Amount (Lakh) 122.24
Retrofitting Year 0
Amount (Lakh) 62.89
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 0
Boundary Wall and Campus Devp.
Pump House (New) 0
Pump House (Repair) 0
Pipe Line (New) 0
Pipe Line (Replacement) 0
FHTC Existing 0
FHTC Repair 0
FHTC New 0
Status Partially Functional > 70 lacs
Specific reason for increasing cost THE SCHEME WAS CONSTRUCTED IN 2012 & COVERS 4 HABITATION. HOWEVER AS PER THE PARTIAL SCHEME, REGULAR WATER SUPPLY IS RUNNING ONLY IN 2 VILLAGE . DURING CONSTRUCTION, A DI PIPE(1159MTR) & GI PIPE MEDIUM CLASS (4510MTR) WAS USED, AS THE SCHEME IS OLD THE GI PIPE & DI PIPE ARE NON FUNCTIONAL. AS PER OUR SURVEY, THE EXISTING NETWORK IS ABOUT 5669 MTR BUT SOME AREAS WERE FOUND MISSING IN THE EARLIER RECORDS. IN WHICH 1884 METER NEW LINE IS PROPOSED. THEREFORE, WE NEED TO EXTEND THE NETWORK BY ABOUT 1884 AND REPAIR APPROX 50% OF THE DAMAGED EXISTING NETWORK. HOUSE CONNECTION WITH GI PIPES & TAPS ARE ALMOST MISSING. HENCE, NEW GI PIPES AND TAPS NEED TO BE INSTALLED, ALONG WITH 35 NEW HOUSE CONNECTIONS & 267 REPAIR FHTC. TO ENSURE PROPER WATER PRESSURE, SLUICE VALVES & AIR VALVES HAVE BEEN CONSI