Brief Description of Works

District Kannauj
Scheme ID 4866951
Scheme Name Khanpur Water Supply Scheme
Village Covered 1
Original Scheme Year 0
Amount (Lakh) 408.33
Retrofitting Year 0
Amount (Lakh) 98.09
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 0
Boundary Wall and Campus Devp.
Pump House (New) 0
Pump House (Repair) 0
Pipe Line (New) 0
Pipe Line (Replacement) 0
FHTC Existing 0
FHTC Repair 0
FHTC New 0
Status Non-Functional > 100 lacs
Specific reason for increasing cost THE SCHEME WAS CONSTRUCTED IN 2014 & COVERS 7 HABITATION. HOWEVER AS PER THE NON FUNCTIONAL SCHEME, REGULAR WATER SUPPLY IS NOT RUNNING IN VILLAGE. DURING CONSTRUCTION, AS PER OUR SURVEY, THE EXISTING NETWORK IS ABOUT 20260 MTR(4 KG PVC PIPE) BUT SOME AREAS WERE FOUND MISSING IN THE EARLIER RECORDS. IN WHICH 6377 METER NEW LINE IS PROPOSED. THEREFORE, WE NEED TO EXTEND THE NETWORK BY ABOUT 6377 AND REPAIR APPROX 14424 METERS OF THE DAMAGED NETWORK. HOUSE CONNECTION WITH GI PIPES & TAPS ARE ALMOST MISSING. HENCE, NEW GI PIPES AND TAPS NEED TO BE INSTALLED, ALONG WITH 153 NEW HOUSE CONNECTIONS & 556 REPAIRING FHTC. TO ENSURE PROPER WATER PRESSURE, SLUICE VALVES & AIR VALVES HAVE BEEN CONSIDERED. SINCE, THE SCHEME IS OLD, IN OHT SEEPAGE IN CYLINDRICAL WALL & BOTTOM DOME ARE FOUND SO WATER PRO