Brief Description of Works
District
Kannauj
Scheme ID
4866996
Scheme Name
Saiyadpur Sakari Water Supply Scheme
Village Covered
3
Original Scheme Year
0
Amount (Lakh)
154.80
Retrofitting Year
0
Amount (Lakh)
56.10
New T/W
0
Rebore T/W
0
New OHT
0
Repair OHT
0
Boundary Wall and Campus Devp.
Pump House (New)
0
Pump House (Repair)
0
Pipe Line (New)
0
Pipe Line (Replacement)
0
FHTC Existing
0
FHTC Repair
0
FHTC New
0
Status
Non-Functional > 100 lacs
Specific reason for increasing cost
THE SCHEME COVERS 5 HABITATION. REGULAR WATER SUPPLY IS RUNNING ONLY IN 2 HABITATION . DURING CONSTRUCTION, A HDPE PIPE WAS USED. AS PER OUR SURVEY, THE EXISTING NETWORK IS ABOUT 19682 MTR BUT SOME AREAS WERE FOUND MISSING & DAMAGED IN THE EARLIER RECORDS. IN WHICH 8240 METER NEW LINE IS PROPOSED.REPAIR APPROX 11442 METERS OF THE DAMAGED NETWORK. HOUSE CONNECTION WITH GI PIPES & TAPS ARE ALMOST MISSING,DAMAGED. HENCE, NEW GI PIPES AND TAPS NEED TO BE INSTALLED, ALONG WITH 190 NEW HOUSE CONNECTIONS & 338 REPAIR. 3 HABITATION OUT OF 5 SUFFERING FROM WATER SUPPLY DUE TO LONG DISTANCE & CANAL EXPRESSWAY & RAILWAY CROSSING, SO WE HAVE TO CONSIDERED A SEPERATE SCHEME FOR THE SAME HABITATION. WE HAVE TAKEN NEW TW,OHT,PH SOME PIPELINE & FHTC FOR THIS SCHEME MENTIONED ABOVE.