Brief Description of Works

District Kannauj
Scheme ID 4867986
Scheme Name Almapur Water Supply Scheme
Village Covered 1
Original Scheme Year 0
Amount (Lakh) 82.47
Retrofitting Year 0
Amount (Lakh) 36.84
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 0
Boundary Wall and Campus Devp.
Pump House (New) 0
Pump House (Repair) 0
Pipe Line (New) 0
Pipe Line (Replacement) 0
FHTC Existing 0
FHTC Repair 0
FHTC New 0
Status Partially Functional > 70 lacs
Specific reason for increasing cost THE SCHEME WAS CONSTRUCTED IN 2013-14 & COVER 1 REVENUE VILLAGES & 1 HABITATIONS. SOME AREA OLD PIPELINE DAMAGE DURING ROAD EXTENSION & DRAIN CONTRUCTION WORK BY PRADHAN. 2356 MTR OLD PIPE LINE REPLACE WITH NEW HDPE PIPE. 66 NEW FHTC WHICH WAS NOT PROVIDED PREVIOUSLY & 610 FHTC CONNECTION GI PIPE MISSING, REPAIRING, GROUTING & NEW GI PIPE REQUIRED VALVES NOT AVAILBLE, SO SLUICE VALVES AND AIR VALVES HAVE BEEN CONSIDERED. OHT TANK LIGHTING CONDUCTOR, SILT EXPULSION , DI/DF PIPE REPAIRING & MS CAGE REQUIRED. SOME REPAIR WORK IS ALSO REQUIRED FOR THE BOUNDARY WALL & PUMP HOUSE.