Brief Description of Works
District
Ambedkar Nagar
Scheme ID
5041767
Scheme Name
Pratappur Chamurkha Water supply scheme
Village Covered
1
Original Scheme Year
2016
Amount (Lakh)
480.43
Retrofitting Year
2020
Amount (Lakh)
4.00
New T/W
2
Rebore T/W
0
New OHT
1
Repair OHT
1
Boundary Wall and Campus Devp.
Boundary Wall construction / repairing and campus development work is proposed (zoning of scheme is done )
Pump House (New)
3
Pump House (Repair)
1
Pipe Line (New)
35685
Pipe Line (Replacement)
7269
FHTC Existing
2298
FHTC Repair
920
FHTC New
601
Status
Partially Functional > 70 lacs
Specific reason for increasing cost
The original scheme was constructed in year 2016.
2 . Initially 40KM (including retrofitting) pipeline was laid, while by recent survey total 81km of pipeline is required. Water can not be supplied to the farther nodes of the scheme currently. Also road dismantling and restoration is also a reason for increase in DPR cost.
3. Since, practically it is not feasible to supply water with existing OHT to last nodes, as a new zone is proposed in this scheme.
4. Due to new habitation and urbanisation, population has been increased rapidly.
