Brief Description of Works

District Ambedkar Nagar
Scheme ID 5042260
Scheme Name Bhiyao water supply scheme
Village Covered 1
Original Scheme Year 2008
Amount (Lakh) 126.00
Retrofitting Year 2020
Amount (Lakh) 205.03
New T/W 1
Rebore T/W 0
New OHT 1
Repair OHT 1
Boundary Wall and Campus Devp. boundary wall construction /repairing and campus development work is proposed in DPR (scheme is divided in zone system)
Pump House (New) 1
Pump House (Repair) 1
Pipe Line (New) 47789
Pipe Line (Replacement) 6393
FHTC Existing 1450
FHTC Repair 943
FHTC New 300
Status Partially Functional > 70 lacs
Specific reason for increasing cost 1. This scheme was made in 12th financial commission in 2012 in which only 15KM of pipeline was laid. 2. While Retrofitting work, OHT was constructed and 4KM of pipeline was laid 3 While by new survey it is required to be 54KM. Since, practically it is not feasible to supply water with existing OHT to farthest nodes, as a new zone is proposed in this scheme. 4.Since, homes are made on both side of the road and the road is wider than 7m. Therefore 4KM Pipeline is required to be laid on both side of the road. 5. Old pipeline was 4KG/sq.cm., while supplying the water to the farther nodes, it leads to many leakages. 6. New population has established their home in discrete manner.