Brief Description of Works

District Ambedkar Nagar
Scheme ID 5042262
Scheme Name Madaniya Water supply scheme
Village Covered 2
Original Scheme Year 2016
Amount (Lakh) 134.23
Retrofitting Year 2020
Amount (Lakh) 33.12
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 1
Boundary Wall and Campus Devp. boundary wall repairing and campus development work is proposed in DPR
Pump House (New) 0
Pump House (Repair) 1
Pipe Line (New) 7028
Pipe Line (Replacement) 0
FHTC Existing 599
FHTC Repair 240
FHTC New 101
Status Partially Functional > 70 lacs
Specific reason for increasing cost 1. The original scheme was constructed during the year 2016-17 2. In retrofitting approx 3 km pipe line 180 fhtc work has been carried out under this scheme. 3. Population shifted due to in alignment of gorakhpur link expreway in discrete manner so new pipe line laying required and according to the survey, New designing is proposed which require change in diameter of pipeline also crossing of above Expressway is proposed. So DPR cost is increasing. 4. Other balance required works are proposed in the DPR