Brief Description of Works

District Ambedkar Nagar
Scheme ID 5042267
Scheme Name Hanswar Water supply scheme
Village Covered 2
Original Scheme Year 2013
Amount (Lakh) 421.25
Retrofitting Year 2020
Amount (Lakh) 150.23
New T/W 1
Rebore T/W 0
New OHT 1
Repair OHT 1
Boundary Wall and Campus Devp. Boundary wall construction /repairing and campus development work is proposed in DPR(zoning is done in scheme)100
Pump House (New) 1
Pump House (Repair) 2
Pipe Line (New) 22059
Pipe Line (Replacement) 37168
FHTC Existing 1000
FHTC Repair 500
FHTC New 1986
Status Partially Functional > 70 lacs
Specific reason for increasing cost 1. In current scenario water cannot be supplied to the farther connections and old pipeline is 4kg/sq.cm., there is many leakages while trying to supply water to farther habitations also for new developed habitation/household are established in discrete manner for which new pipeline is proposed. 2 . Initially 49.16KM (including retrofitting) pipeline was layed, while by recent survey total 59.23km of pipeline is required. Water can not be supplied to the farther nodes of the scheme currently. So practically it is not feasible to supply water with existing OHT to last nodes, therefore a new zone is proposed in this scheme. 3. Due to new habitation and urbanisation, population has been incresed rapidally. 4. Maximum road in this scheme are CC road or Interlocking Road. It is also a reason f