Brief Description of Works

District Sultanpur
Scheme ID 505624
Scheme Name Tirhut
Village Covered 1
Original Scheme Year 2004
Amount (Lakh) 0.00
Retrofitting Year 2021
Amount (Lakh) 0.00
New T/W 0
Rebore T/W 1
New OHT 0
Repair OHT 1
Boundary Wall and Campus Devp.
Pump House (New) 0
Pump House (Repair) 1
Pipe Line (New) 6380
Pipe Line (Replacement) 10720
FHTC Existing 300
FHTC Repair 230
FHTC New 552
Status Non-Functional > 100 lacs
Specific reason for increasing cost The original water supply scheme was constructed during the year 2003–04, with a design period of 15 years as per the approved Detailed Project Report (DPR). As of now, the design period has been exceeded by approximately 6 years, leading to significant deterioration of infrastructure and a noticeable decline in system efficiency. During its initial implementation, the scheme was designed based on a stand post-type water distribution system, which was suitable for the population and demand at that time. However, this approach is now inadequate to meet current water demand and service expectations, especially considering the growth in population and changes in usage patterns. Currently, the scheme has remained non-functional for the last 2–3 years, primarily due to multiple leakages observe