Brief Description of Works

District Sultanpur
Scheme ID 5056771
Scheme Name Saifullaganj
Village Covered 1
Original Scheme Year 2012
Amount (Lakh) 0.00
Retrofitting Year 2020
Amount (Lakh) 0.00
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 1
Boundary Wall and Campus Devp.
Pump House (New) 0
Pump House (Repair) 2
Pipe Line (New) 9661
Pipe Line (Replacement) 12530
FHTC Existing 465
FHTC Repair 310
FHTC New 1063
Status Non-Functional > 100 lacs
Specific reason for increasing cost The original water supply scheme was constructed during the year 2011–12, based on the infrastructure and service requirements at that time. During the implementation phase, some habitation was left out of the pipeline network due to the absence of a railway and NH crossing, which was essential for laying the pipeline across the railway and NH corridor. As a result, the habitation has remained uncovered and without access to the scheme’s water supply, leading to service gaps and community inconvenience. To ensure complete coverage and equitable water distribution, a fully new pipeline is proposed for the excluded habitation. Additionally, one railway and NH crossing is required to facilitate the pipeline alignment and connect the habitation to the main distribution network.