Brief Description of Works
District
Sant Ravidas Nagar
Scheme ID
5241776
Scheme Name
LAGAN BARI
Village Covered
2
Original Scheme Year
2018
Amount (Lakh)
181.58
Retrofitting Year
0
Amount (Lakh)
0.00
New T/W
0
Rebore T/W
0
New OHT
0
Repair OHT
1
Boundary Wall and Campus Devp.
The condition of the boundary wall is good; hence, no repair is required. Similarly, campus development works are not necessary. Only the provision for internal square drain and water recharge mechanism within the water works campus has been made.
Pump House (New)
0
Pump House (Repair)
1
Pipe Line (New)
3103
Pipe Line (Replacement)
0
FHTC Existing
343
FHTC Repair
82
FHTC New
55
Status
Partially Functional > 70 lacs
Specific reason for increasing cost
In Block Suriyawan, Scheme Lagan Bari, Village Darapati, water supply to around 60 households is disrupted due to choked pipelines and damage caused by road widening. A total pipeline length of 3,103 meters has been proposed, which includes damaged sections of the existing pipeline along the road, new connections required for recently constructed houses, and portions of the line that are choked.
