Brief Description of Works

District Sant Ravidas Nagar
Scheme ID 5243313
Scheme Name UGAPUR
Village Covered 7
Original Scheme Year 2014
Amount (Lakh) 161.67
Retrofitting Year 2020
Amount (Lakh) 35.33
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 1
Boundary Wall and Campus Devp. Boundary wall: Provision for double priming coat with putty and double coat exterior emulsion paint. Campus development: No additional campus development works are necessary. Only the provision for internal square drain, including supply of all materials, labour, and T&P etc., complete in all respects, has been made. Provision has also been kept for a water recharge mechanism within the water works campus.
Pump House (New) 0
Pump House (Repair) 1
Pipe Line (New) 6947
Pipe Line (Replacement) 3473
FHTC Existing 1894
FHTC Repair 512
FHTC New 727
Status Partially Functional > 70 lacs
Specific reason for increasing cost Ugapur Rural Water Supply Scheme Block: Aurai District: Bhadohi Current Situation Water supply has been disrupted under the Ugapur Rural Water Supply Scheme, affecting approximately 512 households in the following habitations: Saruli Basti Harizan Basti Barmad Basti Karuna Basti Cause of Disruption The disruption has occurred primarily due to: Choked sections of the existing pipeline. Damage to pipelines during road widening works. Proposed Work To restore and ensure reliable water supply, a pipeline of total length 10,420 meters has been proposed. The scope of work includes: Replacement/repair of damaged sections of the existing pipeline along the road. Provision of new household connections for recently constructed houses. Removal and replacement of choked pipeline portions to ensure sm