Brief Description of Works
District
Sant Ravidas Nagar
Scheme ID
5243313
Scheme Name
UGAPUR
Village Covered
7
Original Scheme Year
2014
Amount (Lakh)
161.67
Retrofitting Year
2020
Amount (Lakh)
35.33
New T/W
0
Rebore T/W
0
New OHT
0
Repair OHT
1
Boundary Wall and Campus Devp.
Boundary wall: Provision for double priming coat with putty and double coat exterior emulsion paint.
Campus development: No additional campus development works are necessary.
Only the provision for internal square drain, including supply of all materials, labour, and T&P etc., complete in all respects, has been made.
Provision has also been kept for a water recharge mechanism within the water works campus.
Pump House (New)
0
Pump House (Repair)
1
Pipe Line (New)
6947
Pipe Line (Replacement)
3473
FHTC Existing
1894
FHTC Repair
512
FHTC New
727
Status
Partially Functional > 70 lacs
Specific reason for increasing cost
Ugapur Rural Water Supply Scheme
Block: Aurai
District: Bhadohi
Current Situation
Water supply has been disrupted under the Ugapur Rural Water Supply Scheme, affecting approximately 512 households in the following habitations:
Saruli Basti
Harizan Basti
Barmad Basti
Karuna Basti
Cause of Disruption
The disruption has occurred primarily due to:
Choked sections of the existing pipeline.
Damage to pipelines during road widening works.
Proposed Work
To restore and ensure reliable water supply, a pipeline of total length 10,420 meters has been proposed. The scope of work includes:
Replacement/repair of damaged sections of the existing pipeline along the road.
Provision of new household connections for recently constructed houses.
Removal and replacement of choked pipeline portions to ensure sm