Brief Description of Works
District
Sant Ravidas Nagar
Scheme ID
5245901
Scheme Name
KHEOKHAR
Village Covered
1
Original Scheme Year
2018
Amount (Lakh)
365.46
Retrofitting Year
2020
Amount (Lakh)
31.04
New T/W
0
Rebore T/W
0
New OHT
0
Repair OHT
1
Boundary Wall and Campus Devp.
"Boundary wall: Provision for double priming coat with putty and double coat exterior emulsion paint.
Campus development: No additional campus development works are necessary.
Only the provision for internal square drain, including supply of all materials, labour, and T&P etc., complete in all respects, has been made.
Provision has also been kept for a water recharge mechanism within the water works campus."
Pump House (New)
0
Pump House (Repair)
1
Pipe Line (New)
5052
Pipe Line (Replacement)
0
FHTC Existing
608
FHTC Repair
128
FHTC New
116
Status
Partially Functional > 70 lacs
Specific reason for increasing cost
Block Abhauli Scheme Kheokhar128 house hold is disrupted due to choked pipeline and damage caused by road widening ,a total pipeline length of 5052 meters has been proposed which includes damaged section of the existing pipeline along the road new connection required for recently constructed houses and portions of the line that are choked write proper Reson for cost increse in DPR
