Brief Description of Works

District Sant Ravidas Nagar
Scheme ID 5245904
Scheme Name Madhopur
Village Covered 2
Original Scheme Year 2018
Amount (Lakh) 225.65
Retrofitting Year 0
Amount (Lakh) 0.00
New T/W 0
Rebore T/W 0
New OHT 0
Repair OHT 1
Boundary Wall and Campus Devp. The condition of the boundary wall is good; hence, no repair is required. Similarly, campus development works are not necessary. Only the provision for internal square drain and water recharge mechanism within the water works campus has been made.
Pump House (New) 0
Pump House (Repair) 1
Pipe Line (New) 3963
Pipe Line (Replacement) 0
FHTC Existing 158
FHTC Repair 48
FHTC New 42
Status Partially Functional > 70 lacs
Specific reason for increasing cost Block Aurai Scheme Madhopur 158 house hold is disrupted due to choked pipeline and damage caused by road widening ,a total pipeline length of 3963 meters has been proposed which includes damaged section of the existing pipeline along the road new connection required for recently constructed houses and portions of the line that are choked